RSS
Preparing the entrance of the runway at the Argyle International Airport.
Preparing the e...
Detail Download
Equipment working at a pace in the 1st km of the project.
Equipment worki...
Detail Download
A view of the remains of Mc Connie Yammie Hills.
A view of the r...
Detail Download
A literal mountain of crushed aggregate from our stone crusher.
A literal mount...
Detail Download
Our stone crusher continues to crush aggregate for pavement of the runway.
Our stone crush...
Detail Download
A lovely view of the runway from South to North.
A lovely view o...
Detail Download
An elevated view of the entire Stone crushing plant.
An elevated vie...
Detail Download
Installing electrical units as they go along.
Installing elec...
Detail Download
Excavating part of Mc Connie Yammie Hill to allow full width of the runway at this section. Taken 10th.6.13
Excavating part...
Detail Download
One of the many areas where aggregate is stored. Taken 10th.6.13
One of the many...
Detail Download
One of the South Rivers Primary School students speaks for the camera. Taken 10th.6.13
One of the Sout...
Detail Download
Workers are building a small drain at the terminal. Taken 10th.6.13
Workers are bui...
Detail Download
PetersVille Academy visited recently.
PetersVille Aca...
Detail Download
Part of the hill s excavated to the terminal building level.
Part of the hil...
Detail Download
Construction and excavation has been persistent at the front of the passenger terminal.
Construction an...
Detail Download
Some of the students of the Kingstown Technical Institute while viewing the airport construction.
Some of the stu...
Detail Download
Teacher Debra Barbour, handing over a cheque for $1000.00 from the staff of the KTI, to be donated to the Argyle Airport project. The cheque was received by IADC\'s Communications Officer, Jennifer Richardson-Herbert. — with Debra Barbour at Argyle In
Teacher Debra B...
Detail Download
Preparations to cast this area of the building.
Preparations to...
Detail Download
Heavy equipment is concentrated here within the first kilometer.
Heavy equipment...
Detail Download
Constructing this last section of the gutter toward the parking lot side of the terminal building.
Constructing th...
Detail Download
 
 
Powered by Phoca Gallery

Partnering Agencies

 
icon label

Sitelock Secure

 
icon label