 The onsite industrial zone where works toward assembling the Asphalt Plant is undergoing.
The onsite ind...
Detail Download
Excavation and blasting continues on this hill. The petroglyphs are on the other side of the works.
Excavation and ...
Detail Download
Closer look at works to assemble the Asphalt Plant.
Closer look at ...
Detail Download
Sections of the Asphalt Plant are laid out for assembling.
Sections of the...
Detail Download
Private truckers still benefit from the AIA construction.
Private trucker...
Detail Download
Toward the 3rd kilometer, the runway and shoulder zones have been lined out.
Toward the 3rd ...
Detail Download
The second culvert found in the 2nd kilometer is now completely covered with dirt.
The second culv...
Detail Download
Containers of the corrugated steel tunnels are on site near to the Yambou River. Soon the spanning of the river will commence.
Containers of t...
Detail Download
dscn6513edit1
dscn6513edit1
Detail Download
dscn6619edit1
dscn6619edit1
Detail Download
 
 
Powered by Phoca Gallery

Partnering Agencies

 
icon label

Sitelock Secure

 
icon label