The Petroglyph hill continues to be leveled to runway height.
The Petroglyph ...
Detail Download
The reclamation site.
The reclamation...
Detail Download
Equipment backfilling at the reclamation site.
Equipment backf...
Detail Download
The runway from the 3rd kilometer.
The runway from...
Detail Download
Construction of the Control Tower base as at 31st March.
Construction of...
Detail Download
the laying of crushed stones on the apron in preparation for pavement is undergoing.
the laying of c...
Detail Download
This drain is under construction at the Apron.
This drain is u...
Detail Download
Construction of the Aircraft Rescue and Fire Fighting Station.
Construction of...
Detail Download
The hill which once footed the Catholic Church is nearly to desired runway level.
The hill which ...
Detail Download
The Parking lot area being prepared for pavement works.
The Parking lot...
Detail Download
Casting the 1st floor of the Control Tower.
Casting the 1st...
Detail Download
Preparing the area earmarked for the Cargo Terminal Building.
Preparing the a...
Detail Download
The removal of the Petroglyphs Hill continues.
The removal of ...
Detail Download
The land reclamation work continues.
The land reclam...
Detail Download
The Control Tower progressing nicely.
The Control Tow...
Detail Download
The construction of the Control Tower as at the 7the April 2014.
The constructio...
Detail Download
The Control tower from a different angle on the 7th April 2014.
The Control tow...
Detail Download
The apron continues to have layers of topsoil and aggregate laid.
The apron conti...
Detail Download
The petroglyph hill continues to have blasting operation done to level it to the height of the runway.
The petroglyph ...
Detail Download
A closer photo of the works on the apron.