 The other Jet Air Bridge has been attached to the building.
The other Jet ...
Detail Download
 Installation work is ongoing for Jet Air Bridge installation as steel columns are erected to make glassed walkway.
Installation w...
Detail Download
 The Cargo Terminal construction continues.
The Cargo Term...
Detail Download
Pavement of the General Aviation Apron has resumed.
Pavement of the...
Detail Download
Jet Air Bridges as viewed from the Control Tower.
Jet Air Bridges...
Detail Download
Remodelling works inside the Departure Lounge.
Remodelling wor...
Detail Download
Unity Youths SVG toured the AIA construction site recently. We estimate more than 100 persons came on this tour.
Unity Youths SV...
Detail Download
This walkway toward one of the jet bridges will be glassed.
This walkway to...
Detail Download
We got closer to the Jet Bridge.
We got closer t...
Detail Download
We got even closer to entering this Jet Bridge.
We got even clo...
Detail Download
The view as you look outside of the jet bridge.
The view as you...
Detail Download
The wheels for the mobile piece of the air bridge have been attached.
The wheels for ...
Detail Download
The backfilling of the 191 Channel is nearly complete.
The backfilling...
Detail Download
Northern end of the project as at 7th August 2015.
Northern end of...
Detail Download
Both Taxi ways and the runway pavement works as at 7th August 2015.
Both Taxi ways ...
Detail Download
The wheels for the other air bridge have been attached.
The wheels for ...
Detail Download
Commissioner of Police Micheal Charles along with his top ranking officers thanked Ms.Richardson with a plaque
Commissioner of...
Detail Download
 Recent works at the 220 channel.
Recent works a...
Detail Download
 The top side of the 220 channel which is currently being cleared.
The top side o...
Detail Download
Clearing the entrance of the 220 channel.
Clearing the en...
Detail Download
 
 