Compaction and the laying of base material in the 3rd km.
Compaction and ...
Detail Download
The laying of base material in the 2nd km of the runway.
The laying of b...
Detail Download
Constant current regulators for airfield lighting and PAPI lights.
Constant curren...
Detail Download
The apron area in its entirety. The extension on the commercial apron is nearing completion.
The apron area ...
Detail Download
One other section of the runway that is being prepared for asphalt pavement.
One other secti...
Detail Download
The Northern end of the airport where the runway is being prepared for asphalt pavement, fencing and backfilling of the 220 channel continues.
The Northern en...
Detail Download
Part of the public road construction at the Northern end of the AIA.
Part of the pub...
Detail Download
The road at the northern end, which will provide public access to Rawacou/Mt Pleasant communities, is still under development.
The road at the...
Detail Download
The completed Airside electrical substation, cargo terminal and fuel farm with the fuel pipes laid out to be fitted.
The completed A...
Detail Download
The passenger terminal, parking lot and Aviation Hangar space.
The passenger t...
Detail Download
The Northern end of the runway the base aggregate continues to be laid in preparation for pavement.
The Northern en...
Detail Download
The passenger terminal building, the fuel farm and part of the runway and taxiways as viewed from nearby community,Calder.
The passenger t...
Detail Download
The tanks for the fuel farm have been painted.
The tanks for t...
Detail Download
Area Representative Hon. Frederick Stephenson was present.
Area Representa...
Detail Download
During Q & A, majority of the attendees had something to say.
During Q & A, m...
Detail Download
One other resident during her compelling delivery at the Town Hall Meeting at Stubbs.
One other resid...
Detail Download
Another resident made his concerns heard at the recently concluded Town Hall meeting.
Another residen...
Detail Download
Another resident\'s contribution during the Q & A segment of the recently concluded Town Hall Meeting.
Another residen...
Detail Download
Hon. Stephenson, Dr.Matthias and Mr.Springer listened on attentively during the Questions and Answers segment.
Hon. Stephenson...
Detail Download
A resident of Stubbs gave her concerns at the recently concluded Town Hall Meeting at Stubbs.
A resident of S...
Detail Download
 
 