This section near to Petroglyph hill is now being prepared for casting. A Mechanical workshop will be built here.
This section ne...
Detail Download
All blasting on Petroglyph hill is complete and focus is now on connecting the fencing in the area.
All blasting on...
Detail Download
Fencing of the the petroglyph hill section has already began.
Fencing of the ...
Detail Download
View of the soon to be painted terminal building. from the apron.
View of the soo...
Detail Download
Minor works currently at the ground handling equipment storage as seen from the apron.
Minor works cur...
Detail Download
A closer look of minor construction works at the ground handling equipment storage.
A closer look o...
Detail Download
To the front of the Cargo terminal, where the electrical team has an apron light preparing for installation.
To the front of...
Detail Download
The large Smith\'s X-Ray machines are onsite to service the cargo through the Cargo terminal.
The large Smith...
Detail Download
The steel frame for the Argyle Aviations Services hangar is currently being offloaded and will soon allow the framing and continued construction on this hangar. N.B These hangars do not need to be complete in order for the airport to be operational.
The steel frame...
Detail Download
The footing for the Mustique Airways hangar continues.
The footing for...
Detail Download
The construction of the third hangar has recently started.
The constructio...
Detail Download
The road from the mainroad to the Cargo terminal and hangars is still under development.
The road from t...
Detail Download
Railings are being installed at the edge of the terminal parking lot.
Railings are be...
Detail Download
This is the remaining fencing installation at the bottom of McConnie Yammie Hill.
This is the rem...
Detail Download
View of works around the Control Tower.
View of works a...
Detail Download
The fencing installation at Petroglyph hill.
The fencing ins...
Detail Download
Closer view of fencing works at the bottom of Mc Connie Yammie Hill.
Closer view of ...
Detail Download
The development of the road toward the Cargo terminal and Hangars as at 8/9/16.
The development...
Detail Download
Construction toward the Eastern side of the AIA.
Construction to...
Detail Download
 
 